MERCA ZARAGOZA

Installation of Telephone Controllers enabling the lighting to be switched on in the different loading bays by means of a missed call.

MUNICIPAL CAMPING

Installation of modular meters to manage consumption in bungalows, caravans and camping plots.

PILAR BASILICA

Lighting on/off control for the Main Altar and 16 adjacent chapels, by means of timing elements enabling greater energy savings.