MUNICIPAL CAMPING

Installation of modular meters to manage consumption in bungalows, caravans and camping plots.

PILAR BASILICA

Lighting on/off control for the Main Altar and 16 adjacent chapels, by means of timing elements enabling greater energy savings.

TOLEDO CITY COUNCIL

Installation of remote outdoor lighting management equipment for public lighting and for all the most emblematic monumental buildings in the city of Toledo, as well as Luminous Flux Stabilisers/Dimmers and remote management equipment for savings and lighting level control of street lights.

MURCIA CITY COUNCIL

The Murcia City Council has installed nine 7.4 kW single-phase VIARIS COMBI + Smart Charging Stations in three important city locations: The Fire Station, the Local Police Station and the car park in the Murcia City Council building. These charging stations will support the charging of the official electric vehicle fleet of these three City […]

MADRID CITY COUNCIL

Control of road lighting via Xeo Lum Managers and Astronomical Time Switches. Additionally, Xeo Aqua Managers have been installed to control the switching on and off of the lighting circuits and water pumps in the city’s ornamental fountains. They also manage the information provided by the water quality analysers.

A-6 AND A-4 MOTORWAYS

Perfect combination for control and savings in the control centres for these motorways’ lighting panels, through the Lighting Remote Management Module and Luminous Flux Stabilisers/Dimmers.

REGIONAL ASSEMBLY OF MURCIA

Installation and commissioning of single phase 7.4 kW / 32 A smart charging stations with Type 2 hoses and additional 32 A Schuko socket outputs in the car park of the Regional Assembly of Murcia, to charge this institution’s official electric vehicles. Additionally, Digital Time Switches and Timers have been installed inside the building.